<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="./twl_formatc.xsl"?>
<servinfo
releasenbr="1"
update="original"
id="h3bd48e441db4be289681c5842522a98"
><title
>STANDARD PROCEDURE - TESTING FOR A SHORT TO GROUND</title><s1
><ptxt
>Remove the fuse and disconnect all items involved with the fuse.</ptxt></s1><s1
><ptxt
>Connect a test light or a voltmeter across the terminals of the fuse.</ptxt></s1><s1
><ptxt
> Starting at the fuse block, wiggle the wiring harness about six to eight inches apart and watch the voltmeter/test lamp.</ptxt></s1><s1
><ptxt
> If the voltmeter registers voltage or the test lamp glows, there is a short to ground in that general area of the wiring harness.</ptxt></s1></servinfo>