<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="./twl_formatc.xsl"?>
<servinfo
releasenbr="1"
update="original"
id="j5143e55baf54e1591a1f2a3283fd44f"
><title
>P0401-EGR SYSTEM PERFORMANCE</title><figure
figtype="2-column-portrait-no-fig-id"
id="g6baf692f1174464a9750a868baa62d0"
><graphic
graphicname="7a03391f"
></graphic></figure><para
><ptxt
>For a complete wiring diagram <emph
>Refer to Section 8W</emph>.</ptxt></para><diagnostic
type="condition"
><title
>Theory of Operation</title><condition
><para
><ptxt
>Exhaust gas recirculation is a method of reducing emissions of oxides of nitrogen. As the inert exhaust gas is recirculated, the mixture absorbs heat in the combustion chamber without interacting
with the fuel/air mixture and reduces the formation of NOx emissions. After the EGR monitor conditions are met, the EGR valve is turned on and off momentarily. The EGR monitor calculated the difference
in engine roughness from the EGR off condition to the EGR condition. This engine combustion stability difference as measured by engine roughness is the measure of a functional EGR system.</ptxt></para><spec
><list1
><item
><ptxt
><emph
>When Monitored:</emph></ptxt><para
><ptxt
>Engine running for greater than two minutes with the Engine Coolant Temp greater than 70°C (158°F). EGR active. Less than 8500 feet. Ambient temperature greater than -6°C (20°F).</ptxt></para></item><item
><ptxt
><emph
>Set Condition:</emph></ptxt><para
><ptxt
>The PCM closes the EGR valve while monitoring the O2 Sensor signal. Once a closed EGR fueling sample has been established the PCM then ramps in EGR and additional fueling while monitoring the O2 sensor
signal in the open state. A fueling sample is again established. The PCM then compares the different O2 Sensor signal readings (fueling samples). If a larger than expected variation is detected, a soft
failure is recorded. Three soft failures set a one trip failure. After two failed trips, a DTC is set and the MIL is illuminated.</ptxt></para></item></list1><table
><tgroup
xmlns:fo="http://www.w3.org/1999/XSL/Format"
xmlns:saxon="http://icl.com/saxon"
border-width.conditionality="retain"
font-size="7pt"
width="100%"
border-collapse="collapse-with-precedence"
table-omit-header-at-break="false"
border-width="1pt"
border-color="black"
border-style="solid"
space-after="6pt"
table-layout="fixed"
><table-column
column-number="1"
column-width="proportional-column-width(396)"
></table-column><thead
><row
><entry
valign="bottom"
align="center"
><ptxt
><emph
>Possible Causes</emph></ptxt></entry></row></thead><tbody
><row
><entry
valign="top"
align="left"
><ptxt
>(Z906) EGR SOLENOID GROUND CIRCUIT OPEN</ptxt></entry></row><row
><entry
valign="top"
align="left"
><ptxt
>(K35) EGR SOLENOID CONTROL CIRCUIT SHORTED TO GROUND</ptxt></entry></row><row
><entry
valign="top"
align="left"
><ptxt
>(K35) EGR SOLENOID CONTROL CIRCUIT SHORTED TO BATTERY VOLTAGE</ptxt></entry></row><row
><entry
valign="top"
align="left"
><ptxt
>(K35) EGR SOLENOID CONTROL CIRCUIT OPEN</ptxt></entry></row><row
><entry
valign="top"
align="left"
><ptxt
>EGR SOLENOID ASSEMBLY</ptxt></entry></row><row
><entry
valign="top"
align="left"
><ptxt
>PCM</ptxt></entry></row></tbody></tgroup></table></spec><para
><ptxt
><emph
>Always perform the Pre-Diagnostic Troubleshooting procedure before proceeding. <extxref
document="SOFTLINK"
extrefid="0900000030"
> (Refer to 9 - ENGINE - DIAGNOSIS AND TESTING)</extxref>.</emph></ptxt></para></condition></diagnostic><diagnostic
type="test"
><?STEP 1------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
><title
>Diagnostic Test</title><spec
><ptxt
><testno><emph>1.</emph></testno> <emph
>ACTIVE DTC</emph></ptxt></spec><test1
><ptxt
>Start the engine.</ptxt></test1><test1
><ptxt
>Allow the engine to reach normal operating temperature.</ptxt></test1><test1
><ptxt
>With a scan tool, select View DTCs.</ptxt></test1><test1
><attention3
name="NOTE"
><ptxt
>It may be necessary to drive the vehicle to meet the conditions to set this DTC, try to repeat the conditions in which the fault originally set by reviewing the Freeze
Frame data.</ptxt></attention3></test1><question
>Is the DTC Active or Pending at this time?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="m3f6d42bc97345bda5a405d209d211f9"
>2</intxref></ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Refer to the INTERMITTENT CONDITION Diagnostic Procedure.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> <symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 2------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="m3f6d42bc97345bda5a405d209d211f9"
><spec
><ptxt
><testno><emph>2.</emph></testno> <emph
>EGR OPERATION</emph></ptxt></spec><attention3
name="NOTE"
><ptxt
>If the vehicle is running rough at idle (scan tool not actuating) follow the yes path to continue.</ptxt></attention3><test1
><ptxt
>Turn all accessories off.</ptxt></test1><test1
><ptxt
>Start the engine.</ptxt></test1><test1
><ptxt
>Allow the engine to reach normal operating temperature.</ptxt></test1><test1
><ptxt
>With the scan tool, enter Engine System Test, then EGR System Test.</ptxt></test1><test1
><ptxt
>Actuate the FLOW function in the EGR System Test.</ptxt></test1><question
>Did the engine run rough or stall?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="f24527e542444b1b97402e9f673790b5"
>3</intxref></ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="o9c4a597c6d345e98d769fd21c606940"
>6</intxref><symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 3------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="f24527e542444b1b97402e9f673790b5"
><spec
><ptxt
><testno><emph>3.</emph></testno> <emph
>EGR VALVE OPEN AT IDLE</emph></ptxt></spec><test1
><ptxt
>Turn the ignition off.</ptxt></test1><test1
><ptxt
>Disconnect the EGR Solenoid Assembly harness connector.</ptxt></test1><test1
><ptxt
>Start engine. Attempt to allow the engine to idle.</ptxt></test1><question
>Does the engine run rough or stall?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Inspect the EGR tube assembly. If OK, replace the EGR valve.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> </ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="dfd661a5e21642c896bebb1e704d64c6"
>4</intxref><symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 4------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="dfd661a5e21642c896bebb1e704d64c6"
><spec
><ptxt
><testno><emph>4.</emph></testno> <emph
>EGR VALVE ASSEMBLY INSPECTION</emph></ptxt></spec><test1
><ptxt
>Inspect the EGR Assembly for the following.</ptxt></test1><test1
><ptxt
>Gasket(s) for leaking</ptxt></test1><test1
><ptxt
>Damage and/or holes in the EGR tube(s)</ptxt></test1><test1
><ptxt
>Carbon build up on or near the EGR pintle and passage ways.</ptxt></test1><test1
><ptxt
>Obstruction in the EGR tubes.</ptxt></test1><question
>Were any problem found?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Repair or replace the EGR Assembly as necessary.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> </ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="h055b03105544e62bd8408999587d7f5"
>5</intxref><symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 5------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="h055b03105544e62bd8408999587d7f5"
><spec
><ptxt
><testno><emph>5.</emph></testno> <emph
>(K35) EGR SOLENOID CONTROL CIRCUIT SHORTED TO BATTERY VOLTAGE</emph></ptxt></spec><figure
figtype="1-column-portrait-no-fig-id"
id="a6892f248d594935832b091535564f41"
><graphic
graphicname="7a021f09"
></graphic></figure><test1
><ptxt
>Turn the ignition off.</ptxt></test1><test1
><ptxt
>Disconnect the EGR Solenoid harness connector.</ptxt></test1><test1
><ptxt
>Ignition on, engine not running.</ptxt></test1><test1
><ptxt
>Measure the voltage on the (K35) EGR Solenoid Control circuit in the EGR Solenoid connector.</ptxt></test1><question
>Is the voltage above 1.0 volt?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Repair the short to battery voltage in the (K35) EGR Solenoid Control circuit.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> </ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="m581c445210d430989ab7095099af66d"
>10</intxref><symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 6------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="o9c4a597c6d345e98d769fd21c606940"
><spec
><ptxt
><testno><emph>6.</emph></testno> <emph
>EGR SOLENOID ASSEMBLY</emph></ptxt></spec><figure
figtype="1-column-portrait-no-fig-id"
id="lcffd21ba3fe49f0b21b6419a138fdee"
><graphic
graphicname="7a021f0a"
></graphic></figure><test1
><ptxt
>Disconnect the EGR Solenoid harness connector.</ptxt></test1><test1
><ptxt
>Using a 12-volt test light, jump across the (K35) EGR Solenoid Control terminal and the (Z906) Ground terminal in the EGR Solenoid harness connector.</ptxt></test1><test1
><ptxt
>With the scan tool, actuate the EGR solenoid.</ptxt></test1><question
>Does the 12-volt test light flash on and off?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Inspect the tube(s) for obstructions and damage, repair as necessary. If OK, replace the EGR Solenoid Assembly.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> </ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="d25868fddf564d8083c0ecea1c104583"
>7</intxref><symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 7-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="d25868fddf564d8083c0ecea1c104583"
><spec
><ptxt
><testno><emph>7.</emph></testno> <emph
> (Z906) EGR SOLENOID GROUND CIRCUIT OPEN</emph></ptxt></spec><figure
figtype="1-column-portrait-no-fig-id"
id="c165271e5a8140328b4b7b78dc0746a1"
><graphic
graphicname="7a021f0b"
></graphic></figure><test1
><ptxt
>Turn the ignition off.</ptxt></test1><test1
><ptxt
>Using a 12-volt test light connected to battery voltage, probe the (Z906) EGR Solenoid ground circuit in the EGR Solenoid harness connector.</ptxt></test1><question
>Does the 12-volt test light illuminate brightly?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="j4caf0e046a140aca643163dc541c7d5"
>8</intxref></ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Repair the open in the (Z906) EGR Solenoid ground circuit.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> <symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 8----------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="j4caf0e046a140aca643163dc541c7d5"
><spec
><ptxt
><testno><emph>8.</emph></testno> <emph
>(K35) EGR SOLENOID CONTROL CIRCUIT SHORTED TO GROUND</emph></ptxt></spec><figure
figtype="1-column-portrait-no-fig-id"
id="g3f047cac9f74dec96cb447b8208c043"
><graphic
graphicname="7a021f0c"
></graphic></figure><test1
><ptxt
>Disconnect the C2 PCM harness connector.</ptxt></test1><test1
><ptxt
>Measure the resistance between ground and the (K35) EGR Solenoid Control circuit in the EGR Solenoid harness connector.</ptxt></test1><question
>Is the resistance below 100 ohms?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Repair the short to ground in the (K35) EGR Solenoid Control circuit.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> </ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="ib098add9ed8416093dc5a312269e16a"
>9</intxref><symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 9------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="ib098add9ed8416093dc5a312269e16a"
><spec
><ptxt
><testno><emph>9.</emph></testno> <emph
>(K35) EGR SOLENOID CONTROL CIRCUIT OPEN</emph></ptxt></spec><figure
figtype="1-column-portrait-no-fig-id"
id="nfcf818d754c47108f92b871ad9c5e8c"
><graphic
graphicname="7a021f0d"
></graphic></figure><attention2
name="CAUTION"
><ptxt
>Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special
Tool #8815 to perform diagnosis.</ptxt></attention2><test1
><ptxt
>Measure the resistance of the (K35) EGR Solenoid Control circuit from the EGR Solenoid harness connector to the appropriate terminal of special tool #8815.</ptxt></test1><question
>Is the resistance below 5.0 ohms?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Go To <intxref
refid="m581c445210d430989ab7095099af66d"
>10</intxref></ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Repair the open in the (K35) EGR Solenoid Control circuit.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> <symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp><?STEP 10------------------------------------------------------------------------------------------------------------------------------------------------------------------------------?><testgrp
id="m581c445210d430989ab7095099af66d"
><spec
><ptxt
><testno><emph>10.</emph></testno> <emph
>PCM</emph></ptxt></spec><attention3
name="NOTE"
><ptxt
>Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.</ptxt></attention3><test1
><ptxt
>Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.</ptxt></test1><question
>Were there any problems found?</question><result
>Yes</result><action
><list1
><item
><ptxt
>Repair as necessary.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> </ptxt></item></list1></action><result
>No</result><action
><list1
><item
><ptxt
>Replace and program the Powertrain Control Module per Service Information.</ptxt></item><item
><ptxt
>Perform the POWERTRAIN VERIFICATION TEST. <extxref
document="SOFTLINK"
extrefid="0900000360"
>(Refer to 9 - ENGINE - STANDARD PROCEDURE)</extxref> <symbol
name="SKIP"
></symbol></ptxt></item></list1></action></testgrp></diagnostic></servinfo>