<?xml version="1.0"?>
<?xml-stylesheet type="text/xsl" href="./twl_formatc.xsl"?>
<servinfo
releasenbr="1"
update="original"
id="bf43f2bf55db4d7aade50f7091d367d9"
><title
>INSTALLATION</title><attention3
name="NOTE"
><ptxt
>LHD model shown in illustrations. RHD model similar.</ptxt></attention3><servinfosub
><topic
><title
>PASSENGER SIDE</title><figure
figtype="1-column-portrait-no-fig-id"
id="c0f50e2c12c74ced81c49d34ef587652"
><graphic
graphicname="7a033b2f"
></graphic></figure><s1
><ptxt
>Connect the floor duct (1) to the passenger side of the air distribution housing (2). Make sure the duct is fully engaged to the housing.</ptxt></s1><s1
><ptxt
>Install the HVAC housing assembly into the instrument panel <extxref
document="SOFTLINK"
extrefid="2404019420"
>(refer to 24 - HEATING &amp; AIR CONDITIONING/DISTRIBUTION/HOUSING-HVAC
- HOUSING-HVAC ASSEMBLY - INSTALLATION)</extxref>.</ptxt></s1><s1
><ptxt
>Install the instrument panel <extxref
document="SOFTLINK"
extrefid="2334013420"
>(refer to 23 - BODY/INSTRUMENT PANEL/ASSEMBLY-INSTRUMENT PANEL - INSTALLATION)</extxref>.<symbol
name="skip"
></symbol></ptxt></s1></topic><topic
><title
>DRIVER SIDE</title><figure
figtype="1-column-portrait-no-fig-id"
id="na5a590177ca4287bc0242709087c5e1"
><graphic
graphicname="7a033b30"
></graphic></figure><attention3
name="NOTE"
><ptxt
>Illustration shown with instrument panel removed for clarity.</ptxt></attention3><s1
><ptxt
>Connect the floor duct (1) to the driver side of the air distribution housing (2). Make sure the duct is fully engaged to the housing.</ptxt></s1><s1
><ptxt
>Install the steering column opening cover (refer to 23 - BODY/INSTRUMENT PANEL/COVER-STEERING COLUMN OPENING - INSTALLATION).</ptxt></s1><s1
><ptxt
>Reconnect the negative battery cable.<symbol
name="skip"
></symbol></ptxt></s1></topic></servinfosub></servinfo>